Abstract

In construction projects, change orders are commonly faced. These change orders, which are issued by the owner, may cause interruption to the contractor's work, resulting in damages such as loss of labor productivity, delay damages, and cost overruns which may lead to claims. The relationship between change orders and loss of labor productivity is not well understood because of the difficulty in linking the cause of the productivity loss to the change order. So, to receive compensation, the contractor needs to prove with a credible calculation that the productivity loss was a result of the change order issued by the owner. Compared to all available productivity loss quantification methods, the "Measured Mile" approach is considered the most acceptable and popular approach in litigation. In this study, loss of labor productivity due to change orders is studied using a system dynamics method. A system dynamics model is developed using Vensim Software, validated, and utilized to quantitatively measure the impact of the change in the project scope on labor productivity. Different road construction projects were analyzed using both methods: measured mile analysis and system dynamics model; then, the results from those two approaches were compared.

Graduation Date

2016

Semester

Fall

Advisor

Oloufa, Amr

Degree

Doctor of Philosophy (Ph.D.)

College

College of Engineering and Computer Science

Department

Civil, Environmental and Construction Engineering

Degree Program

Civil Engineering

Format

application/pdf

Identifier

CFE0006430

URL

http://purl.fcla.edu/fcla/etd/CFE0006430

Language

English

Release Date

December 2017

Length of Campus-only Access

1 year

Access Status

Doctoral Dissertation (Campus-only Access)

Share

COinS