Keywords

brevard, stormwater, detention, poppleton, stuart

Description

Final report describing and documenting the construction and monitoring of the Poppleton Creek wet detention system implemented by the City of Stuart to reduce stormwater pollutant loadings discharged to impaired waters. Monitoring was conducted over a nine month period but only two storms resulted in a discharge from the system due to significant ground water infiltration. Accordingly, during this period of time the system demonstrated high levels of load reduction for both TN (43%) and TP (87%).

Contributors

Cape Canaveral Scientific, Inc.

Stormwater Solutions, Inc.

City of Stuart, Florida

Date Created

3-1-2010

Type

Publication

Language

English

Number of Pages

24

College

College of Engineering & Computer Science

Type

article

Share

COinS
 

Accessibility Statement

This item was created or digitized prior to April 24, 2027, or is a reproduction of legacy media created before that date. It is preserved in its original, unmodified state specifically for research, reference, or historical recordkeeping. In accordance with the ADA Title II Final Rule, the University Libraries provides accessible versions of archival materials upon request. To request an accommodation for this item, please submit an accessibility request form.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.