Expected response times for closed-loop multivehicle AMHS

Authors

    Authors

    D. Nazzal;L. F. McGinnis

    Comments

    Authors: contact us about adding a copy of your work at STARS@ucf.edu

    Abbreviated Journal Title

    IEEE Trans. Autom. Sci. Eng.

    Keywords

    Markov chains; material handling systems; semiconductor tabs; MATERIAL-HANDLING SYSTEMS; GUIDED VEHICLE SYSTEMS; WAITING-TIMES; SINGLE-DEVICE; DESIGN; MODEL; Automation & Control Systems

    Abstract

    We present an analytical approach for estimating the expected time for an automated material handling system (AMHS) to respond to move requests at loading stations in a vehicle-based, unidirectional, closed-loop AMHS. The expected response times are important for estimating the expected work-in-process (WIP) levels at the loading stations for design purposes, and for evaluating the performance of the AMHS as delayed response can impact the production cycle times. The expected response time approximation is validated by comparing the analytical model to the simulation results using a SEMATECH 300 mm hypothetical fab data set.

    Journal Title

    Ieee Transactions on Automation Science and Engineering

    Volume

    4

    Issue/Number

    4

    Publication Date

    1-1-2007

    Document Type

    Article

    Language

    English

    First Page

    533

    Last Page

    542

    WOS Identifier

    WOS:000250374900006

    ISSN

    1545-5955

    Share

    COinS