Secondary Author(s)

Vieira, Robin

Report Number

FSEC-CR-1761-08

URL

http://publications.energyresearch.ucf.edu/wp-content/uploads/2018/06/FSEC-CR-1761-08.pdf

Keywords

HVAC; Buildings; Humidity; AC system equipment; Indoor humidity control; Equipment selection; Operational issues; Air conditioning

Abstract

This report presents summary of research on equipment selection and operation issues with conventional air conditioning equipment that can be employed prior to seeking the added first cost and operating cost of separate dehumidifiers.

Date Published

6-23-2008

Identifiers

407

Subjects

Air conditioning; Humidity--Control; Construction industry--Accounting; Cost effectiveness

Local Subjects

Humidity; Buildings - HVAC

Type

Text; Document

Format

application/pdf

Collection

FSEC Energy Research Center® Collection

Share

COinS
 

Accessibility Statement

This item was created or digitized prior to April 24, 2027, or is a reproduction of legacy media created before that date. It is preserved in its original, unmodified state specifically for research, reference, or historical recordkeeping. In accordance with the ADA Title II Final Rule, the University Libraries provides accessible versions of archival materials upon request. To request an accommodation for this item, please submit an accessibility request form.

Rights Statement

In Copyright