Abstract
Two nearly identical houses situated next to each other in Bossier City, Louisiana were studied in an effort to better understand moisture and cooling energy related problems in manufactured houses with low thermostat set-points during the cooling season. By design, the major difference between houses was the type of air conditioning units. House A had a standard split air conditioner and House B had a two-speed split air conditioner.
In an effort to make the buildings more similar, the building airtightness was adjusted until it was the same in each house, and duct leaks were sealed so that the ducts were tight and there was equal tightness in both houses. A ventilation system was also added at the same time of duct repair. Duct repair and the ventilation modifications resulted in significant impacts on the cooling energy, temperature, relative humidity, and building pressures. Cooling energy decreased 37% in House A and 18% in House B, while the floor space dewpoint increased significantly. It is estimated that 35 % savings was due solely to duct repair in House A and 17% in House B. The primary cause of House A savings being twice House B is attributed to House A operating at nearly twice the capacity most of the time and had more duct leakage repaired. This resulted in higher system pressures and therefore greater duct leakage than in House B. Before building modifications, House A used 15.4 kWh per day (32%) more than House B and 3.4 kWh per day (11%) more after modifications. A method of characterizing interstitial spaces using dewpoint measurement is presented and shows that the belly space became 2.6 times more like outdoor conditions after repairs in House A and 2.0 times more in House B.
Date Published
5-15-2002
Identifiers
576
Subjects
Air conditioning; Dwellings--Energy conservation; Buildings--Environmental engineering; Humidity--Control; Energy consumption; Building fittings
Local Subjects
Buildings - Cooling; Buildings - Ducts; Buildings - HVAC; Buildings - Manufactured Houses; Buildings - Ventilation
Type
Text; Document
Contributor (Linked Data)
Chasar, Dave [LC]
Collection
FSEC Energy Research Center® Collection
STARS Citation
Florida Solar Energy Center and Withers, Jr., Charles, "Performance and Impact from Duct Repair and Ventilation Modifications of Two Newly Constructed Manufactured Houses Located in a Hot and Humid Climate" (2002). FSEC Energy Research Center®. 576.
https://stars.library.ucf.edu/fsec/576
Notes
Reference Publication: Withers, C., Chasar, D., Moyer, N., and Chandra, S. "Performance and Impact from Duct Repair and Ventilation Modifications of Two Newly Constructed Manufactured Houses Located in a Hot and Humid Climate", Thirteenth Symposium on Improving Building Systems in Hot and Humid Climates, May 2022, 2002 Houston, Texas.