Abstract

In order to compete in manufacturing, industry realizes it must work more efficiently with its resources. Three manufacturing techniques have been developed to assist industry in this challenge --MRP, JIT, and OPT. This paper compares these three techniques. It concentrates on the factors that affect production after vendor materials are in-house. A brief discussion of some of the implementation difficulties a company may face during the transition to a new philosophy is also addressed. Finally, a case study of a low volume, highly technical military project is evaluated and analyzed.

Notes

If this is your thesis or dissertation, and want to learn how to access it or for more information about readership statistics, contact us at STARS@ucf.edu

Graduation Date

1988

Semester

Fall

Advisor

Sepulveda, Jose A.

Degree

Master of Science (M.S.)

College

College of Engineering

Department

Industrial Engineering and Management Systems

Format

PDF

Pages

74 p.

Language

English

Rights

Public Domain

Length of Campus-only Access

None

Access Status

Masters Thesis (Open Access)

Identifier

DP0022058

Subjects

Dissertations, Academic -- Engineering; Engineering -- Dissertations, Academic

Accessibility Status

Searchable text

Share

COinS