Abstract
In order to compete in manufacturing, industry realizes it must work more efficiently with its resources. Three manufacturing techniques have been developed to assist industry in this challenge --MRP, JIT, and OPT. This paper compares these three techniques. It concentrates on the factors that affect production after vendor materials are in-house. A brief discussion of some of the implementation difficulties a company may face during the transition to a new philosophy is also addressed. Finally, a case study of a low volume, highly technical military project is evaluated and analyzed.
Notes
If this is your thesis or dissertation, and want to learn how to access it or for more information about readership statistics, contact us at STARS@ucf.edu
Graduation Date
1988
Semester
Fall
Advisor
Sepulveda, Jose A.
Degree
Master of Science (M.S.)
College
College of Engineering
Department
Industrial Engineering and Management Systems
Format
Pages
74 p.
Language
English
Rights
Public Domain
Length of Campus-only Access
None
Access Status
Masters Thesis (Open Access)
Identifier
DP0022058
Subjects
Dissertations, Academic -- Engineering; Engineering -- Dissertations, Academic
STARS Citation
Denicole Christopher, Donna M., "MRP, JIT, and OPT: A Comparison on the Production Floor" (1988). Retrospective Theses and Dissertations. 4273.
https://stars.library.ucf.edu/rtd/4273
Accessibility Status
Searchable text