Title

Ontology-Centered Integration Of Project Management, Cost And Resource Modeling With Analysis, Simulation And Visualization: A Case Study Of Space Port Operations

Abstract

As the size and complexity of space launches continues to grow an architecture is becoming ever more necessary to accurately organize and determine workforce requirements for the involved organizations. The Launch Services Program at Kennedy Space Center has recently begun using a tool developed by the technology consulting firm Booz-Allen Hamilton specifically for this purpose. This paper addresses the possibility of transferring the information developed and organized by the Kennedy Workforce Planning Tool into a standard Microsoft Project document with integrated cost, resource modeling and analysis, simulation and visualization using an ontology-centered approach. The study emphasize on the potential of being able to forecast the workforce resource requirements. © 2007 IEEE.

Publication Date

12-1-2007

Publication Title

Proceedings - Winter Simulation Conference

Number of Pages

2032-2040

Document Type

Article; Proceedings Paper

Personal Identifier

scopus

DOI Link

https://doi.org/10.1109/WSC.2007.4419834

Socpus ID

49749152056 (Scopus)

Source API URL

https://api.elsevier.com/content/abstract/scopus_id/49749152056

This document is currently not available here.

Share

COinS