Title
Expected Response Times For Closed-Loop Multivehicle Amhs
Keywords
Markov chains; Material handling systems; Semiconductor fabs
Abstract
We present an analytical approach for estimating the expected time for an automated material handling system (AMHS) to respond to move requests at loading stations in a vehicle-based, unidirectional, closed-loop AMHS. The expected response times are important for estimating the expected work-in-process (WIF) levels at the loading stations for design purposes, and for evaluating the performance of the AMHS as delayed response can impact the production cycle times. The expected response time approximation is validated by comparing the analytical model to the simulation results using a SEMATECH 300 mm hypothetical fab data set. © 2007 IEEE.
Publication Date
10-1-2007
Publication Title
IEEE Transactions on Automation Science and Engineering
Volume
4
Issue
4
Number of Pages
533-542
Document Type
Article
Personal Identifier
scopus
DOI Link
https://doi.org/10.1109/TASE.2007.906141
Copyright Status
Unknown
Socpus ID
35348906323 (Scopus)
Source API URL
https://api.elsevier.com/content/abstract/scopus_id/35348906323
STARS Citation
Nazzal, Dima and McGinnis, Leon F., "Expected Response Times For Closed-Loop Multivehicle Amhs" (2007). Scopus Export 2000s. 6335.
https://stars.library.ucf.edu/scopus2000/6335