Title
Ground And Range Operations For A Heavy-Lift Vehicle: Preliminary Thoughts
Abstract
This paper discusses the ground and range operations for a Shuttle derived Heavy-Lift Vehicle being launched from the Kennedy Space Center on the Eastern range. Comparisons will be made between the Shuttle and a heavy lift configuration (SLS-ETF MPCV - April 2011) by contrasting their subsystems. The analysis will also describe a simulation configuration with the potential to be utilized for heavy lift vehicle processing/range simulation modeling and the development of decision-making systems utilized by the range. In addition, a simple simulation model is used to provide the required critical thinking foundations for this preliminary analysis. © 2011 SAE International.
Publication Date
11-1-2011
Publication Title
SAE International Journal of Aerospace
Volume
4
Issue
2
Number of Pages
1064-1073
Document Type
Article
Personal Identifier
scopus
DOI Link
https://doi.org/10.4271/2011-01-2643
Copyright Status
Unknown
Socpus ID
84859313881 (Scopus)
Source API URL
https://api.elsevier.com/content/abstract/scopus_id/84859313881
STARS Citation
Rabelo, Luis; Bardina, Jorge; Zhu, Yanshen; and Compton, Jeppie, "Ground And Range Operations For A Heavy-Lift Vehicle: Preliminary Thoughts" (2011). Scopus Export 2010-2014. 1911.
https://stars.library.ucf.edu/scopus2010/1911