Photographer

Preview

image preview

Photo Description

The CEBA building complex under construction. Construction has only started, and the concrete forms for the first floor are the only things existing. A few students are walking, and there is a van in the bottom right of the picture. Written on back "CEBA rises as the first building to face Pegasus Circle, future hub of the campus. The $7.3 million, 125,000 square foot phase I will house the College of Engineering with Business Administration to follow in phase II. UCF Report, 5/2/84, p. 4"

Subject

University of Central Florida--Buildings--Photographic prints; Universities & colleges--Florida--Orlando; University of Central Florida--Students--Photographic prints;

Date Original

5-2-1984

Contributing Unit

Unknown

Number of Images

2

Format

tiff

Size Original

19.5 cm. x 11.5 cm.

Document Type

Photograph

Coverage-Temporal

20th century

Place

Orlando (Fla.)

Digital Reproduction Specifications

Jpeg2000 images were derived from no less than 400 dpi tiff images

Date Digital

2011-06

Date Contributed

10-4-2017

Identifier

DP0011547

Type

image

Rights

All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact Special Collections and University Archives, University of Central Florida Libraries, (407) 823-2576 http://library.ucf.edu/SpecialCollections/

File Location

V:\Archives\University Photograph Collection\II Buildings, 1966-1995\Engineering & Business Administration\Master

Collection

University Photograph Collection

Share

COinS