Images of Central Florida
Preview
Photographer
Katherine G. Mikler
Keywords
Parsonage; Demolition; Construction, 1991-92; Parsonage removal
Description
The parsonage built for Pastor Tuhy and his family in the mid-1930s is being removed to make room for the construction of the new sanctuary. c.1991-92. Far right, a portion of the parsonage has been loaded onto a trailer and covered with plastic for move to a new site. The old garage and restrooms added in the 1940s await demolition
Date
c. 1991-92
Coverage-Spatial
Seminole County, Fla.; Slavia (Fla.)
Side of Image
Front of Postcard
Repository
St. Luke's Lutheran Church and School; DSpace at St. Luke's
Repository Collection
St. Luke's Lutheran Church: Brick church 1957-1992; Katherine G. Mikler Collection
Identifier
DP0016178
Rights Statement
All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact St. Luke’s Lutheran Church at 2021 W SR 426, Oviedo, FL 32765 or (407) 365-3408.
Digital Publisher
St. Luke's Lutheran Church, Oviedo, Fla.
Digital Reproduction Specifications
Jpeg2000 images were derived from previously scanned jpeg images.
Recommended Citation
"St. Luke's Church Expansion. Removal of the Parsonage, c. 1991-92" (1991). Images of Central Florida. 365.
https://stars.library.ucf.edu/cfm-images/365
Keywords
Parsonage; Demolition; Construction, 1991-92; Parsonage removal