Images of Central Florida
Preview
Photographer
Figbar Associates, Inc
Keywords
Figbar Associates, Inc.; Demolition; Demolition of 1957 addition; Barbosa, Jose; Blueprint; Archictural design
Description
A blueprint prepared by Figbar Associates, Inc. to guide the demolition process as St. Luke's prepared to erect a new sanctuary in the early 1990s. Architect Jose Barbosa prepared the plan which dictated the order in which the 1939 chancel would be emptied and the 1957 transepts would be demolished before the new construction could begin. The plan included instructions that the stained glass windows and cast bronze bell would be removed by "the owners" and that the contractor should "reclaim sufficient amount of bricks" (while demolishing the transepts) "to restore affected wall areas."
Date
early 1990s
Coverage-Spatial
Seminole County, Fla.
Number of Images
1
Side of Image
Front of Postcard
Repository
St. Luke's Lutheran Church and School; DSpace at St. Luke's
Repository Collection
D. Expanded Church 1993-2011;
Identifier
DP0020228
Rights Statement
All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact St. Luke’s Lutheran Church at 2021 W SR 426, Oviedo, FL 32765 or (407) 365-3408.
Digital Publisher
St. Luke's Lutheran Church, Oviedo, Fla.
Digital Reproduction Specifications
Jpeg2000 images were derived from previously scanned jpeg images.
Recommended Citation
"Demolition Plans for Removal of 1957-Built Transepts" (1990). Images of Central Florida. 405.
https://stars.library.ucf.edu/cfm-images/405
Keywords
Figbar Associates, Inc.; Demolition; Demolition of 1957 addition; Barbosa, Jose; Blueprint; Archictural design