Images of Central Florida
Preview
Photographer
Unknown
Keywords
1993 church facility; Exterior construction, 1991-92; Construction, 1991-92
Description
Views of final phases of construction of the exterior of St. Luke's new facility, which was ultimately dedicated in November, 1993. Photos, c.1992 through mid-1993.
Date
c. 1992
Coverage-Spatial
Seminole County, Fla.
Side of Image
Front of Postcard
Repository
St. Luke's Lutheran Church and School; DSpace at St. Luke's
Repository Collection
D. Expanded Church 1993-2011
Identifier
DP0020459
Rights Statement
All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact St. Luke's Lutheran Church at 2021 W SR 426, Oviedo, FL 32765 or (407) 365-3408.
Digital Publisher
St. Luke's Lutheran Church, Oviedo, Fla.
Digital Reproduction Specifications
Jpeg2000 images were derived from previously scanned jpeg images.
Recommended Citation
"Final stages of exterior construction of new facility. c.1992" (1992). Images of Central Florida. 4602.
https://stars.library.ucf.edu/cfm-images/4602
Keywords
1993 church facility; Exterior construction, 1991-92; Construction, 1991-92