Images of Central Florida
Preview
Photographer
Unknown
Keywords
Church expansion; New church facility; 1993 church facility
Description
On March 8, 1992, the congregation was invited to view a large architectural rendering (painting) of the proposed church facility, as well as a three-dimensional table-top model of that same structure. In a special meeting of the church voters called in December, 1990, the congregation had agreed to proceed with the building of a new facility. More than a year passed before the members were to see the architectural rendering and model. Contractors' bids for construction, however, were much higher than expected and many revisions (most significantly: the lowering of ceiling as shown in the model and also the decision to use stucco, rather than brick for exterior walls) were made before the congregation signed contracts for the construction of the final architectural version for the facility.
Date
March 8, 1992
Coverage-Spatial
Seminole County, Fla.
Side of Image
Front of Postcard
Repository
St. Luke's Lutheran Church and School; DSpace at St. Luke's
Repository Collection
C. Brick Church 1957 - 1992
Identifier
DP0020493
Rights Statement
All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact St. Luke's Lutheran Church at 2021 W SR 426, Oviedo, FL 32765 or (407) 365-3408.
Digital Publisher
St. Luke's Lutheran Church, Oviedo, Fla.
Digital Reproduction Specifications
Jpeg2000 images were derived from previously scanned jpeg images.
Recommended Citation
"Renderings and model of proposed new church facility. March 8, 1992" (1992). Images of Central Florida. 4650.
https://stars.library.ucf.edu/cfm-images/4650
Keywords
Church expansion; New church facility; 1993 church facility