Images of Central Florida
Preview
Photographer
Unknown
Keywords
Church office; Construction, 1991-92; Portable building; 1991-93
Description
The church office was moved 3 times during Pastor E.J. Rossow's first several years at St. Luke's! In 1987, the south transept of the 1957 church, used for 30 years as vestry, office and storage space, was remodeled to allow seating for more worshipers. The office functions were moved to the former parsonage adjacent to the church. But only a few years later, construction was begun on a new facility. The church parsonage was then removed to a private site off-campus. The church provided the office space it would need temporarily by renting a portable building and locating it on the campus of St. Luke's School, very nearby the church. In late 1993, the new facility received its CO and the office staff moved, once again, to a large suite of rooms in the new building.
Date
1991-93
Side of Image
Front of Postcard
Repository
St. Luke's Lutheran Church and School; DSpace at St. Luke's
Repository Collection
St. Luke's Lutheran Church: Brick church 1957-1992; SLLC Church Archives
Identifier
DP0015844
Rights Statement
All rights to images are held by the respective holding institution. This image is posted publicly for non-profit educational uses, excluding printed publication. For permission to reproduce images and/or for copyright information contact St. Luke's Lutheran Church at 2021 W SR 426, Oviedo, FL 32765 or (407) 365-3408.
Digital Publisher
St. Luke's Lutheran Church, Oviedo, Fla.
Digital Reproduction Specifications
Jpeg2000 images were derived from previously scanned jpeg images.
Disciplines
Photography
Recommended Citation
"Temporary church office space during new church construction 1991-93" (1993). Images of Central Florida. 4749.
https://stars.library.ucf.edu/cfm-images/4749
Keywords
Church office; Construction, 1991-92; Portable building; 1991-93