Using DSM for modeling information flow in construction design projects

Authors

    Authors

    A. A. Oloufa; Y. A. Hosni; M. Fayez;P. Axelsson

    Comments

    Authors: contact us about adding a copy of your work at STARS@ucf.edu

    Abbreviated Journal Title

    Civ. Eng. Environ. Syst.

    Keywords

    DSM; coupled activity; trigger value; design; CRITICAL-PATH; Engineering, Civil

    Abstract

    Construction design projects are multi-disciplinary requiring input from several players including planners and design professionals. Project managers have developed techniques for planning, organizing, monitoring, and optimizing complex design projects. The critical path method (CPM) is traditionally the most commonly used to address these issues. Various techniques have been added to CPM like splitting the activities to optimize project duration. However, the CPM approach is based on workflow and is not effective in handling the iterative process characterizing design projects. Also, while CPM can effectively handle sequential and parallel activities, it cannot handle coupled activities. The design structure matrix (DSM) approach differs from CPM in that it represents information flows in addition to workflows in a project. The DSM method can handle sequential, parallel, in addition to coupled activities. In this article, an algorithm has been developed based on a combined DSM and CPM methodology. The main objective of algorithm is to optimize the planning of design projects. A new concept has been introduced in the paper termed the 'Trigger Value Matrix.' The objective of the trigger value matrix is monitoring changes made in a multi-disciplinary design process as these changes can potentially lead to increased costs and durations. The application of the combined DSM-CPM and the trigger value matrix has been incorporated in a software tool (DSMPM V1.0) that can be used by design companies. Using DSMPM, management focuses on the essential information transfer requirements in the project thereby minimizing rework, and improving throughput and design quality.

    Journal Title

    Civil Engineering and Environmental Systems

    Volume

    21

    Issue/Number

    2

    Publication Date

    1-1-2004

    Document Type

    Article

    Language

    English

    First Page

    105

    Last Page

    125

    WOS Identifier

    WOS:000221450800003

    ISSN

    1028-6608

    Share

    COinS