Keywords

Government purchasing, Public contracts

Abstract

The government often imposes requirements on their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the need for special information and features in a government contractor's manufacturing/material control system. This report specifically addresses those features which would be desirable in a government contractor's MRP system. These features involve the operation of the master schedule, the bill of material, the MRP software, the inventory files, purchasing, and shop floor control. No single government requirement is in direct conflict with the intent of an MRP system. However, the interpretation of these requirements vary within the government agencies and between government contractors. The contractor, the appropriate government agency, and the software vendor, if applicable, need to work together to implement a system which satisfies both internal management needs and government requirements. This report contains features and considerations which should be evaluated when a government contractor is implementing an MRP system.

Notes

If this is your thesis or dissertation, and want to learn how to access it or for more information about readership statistics, contact us at STARS@ucf.edu

Graduation Date

Summer 1983

Advisor

Brooks, George H.

Degree

Master of Science (M.S.)

College

College of Engineering

Degree Program

Engineering

Format

PDF

Pages

80 p.

Language

English

Rights

Public Domain

Length of Campus-only Access

None

Access Status

Masters Thesis (Open Access)

Identifier

DP0013999

Accessibility Status

Searchable text

Included in

Engineering Commons

Share

COinS